Metal Roofs
Whether your metal roof needs repaired or replaced, we will take the time to get it done right for you. Here is how we get the job done for you.
Here is a beautiful metal roof! Note how the color and style matches the natural beauty of the home in its’ setting.

The cost of a metal roof both in materials and labors are significantly more than an asphalt shingle roof. The beauty of the roof (as seen above) is more than worth it for most property owners.
Our Process

STEP 1: Project Interview
Clearly understanding the issues and your concerns helps the estimator review the issues he will bid. He may order a satellite measurement of your roof. He will visually inspect the roof at the time of the appointment with you.
STEP 2: Estimate
We complete the interview and inspection. And, get the correct measurements. Then the estimator will use professional software to generate a detailed estimate for your review. We will discuss together any questions you have about it.
STEP 3: Job Approval
You agree that working with Raven Roofing is your best option. You sign the estimate and make your deposit payment. Raven Roofing then orders all materials needed to do your job right. Many times, your new materials will be loaded on to your roof by the supplier.
STEP 4: Work Commenced
On a date agreed with you, our crews show up make needed repairs. We clean up your site. All work is completed in 5 to 10 days.
STEP 5: PROJECT COMPLETED
The crew has done their job. You review the job with the Lead crew member or estimator. Everyone is happy! You make the final payment to Raven Roofing and live safely under a dry roof.
Questions, Call Us (801) 367-7554
Frequently asked questions
You will have so many questions as you embark on this process to repair and replace your roof with new shingles. Some of the critical questions every home or business owners should ask are below. You will have more questions. We have the answers. Read through these and then call us with the rest.
What is your License Number?
An important question to ask. If the roofer has a license number, you’re working with a roofer who complies with our building codes and licensing laws. Raven Roofing is licensed contractor. It also means that you will have potential more legal recourse in the event that something goes wrong with the work, too. Raven Roofing is compliant with the contracting laws in Utah.
Do you have Workman's Comp Insurance?
Do you use roofing subcontractors?
The simple answer is usually “no”. Although there are occasions when we may call in a more qualified worker who is an independent subcontractor. We ensure that our subcontractors might not have Contractor’s licenses and workman’s comp insurance.
What is the difference between a tear off and a 2nd layer layover?
With a second layer of on your home the newly installed shingles wear out prematurely. You also cannot address the potential trouble areas of your current roofing system if you just “layover” a new set of shingles. A new set of shingles overlayed may cover up poorly installed or failing wall flashing, step flashing, chimney flashing and rotten wood decking also known as sheeting. It may also cover up the fact that you are missing ice and water shield. For a better quality and longer lasting roof the old roof should always be removed before a new one is installed. On lower sloped shingle roofs, the top layer will conform to the bottom layer and then creates cupping. These cups start to hold water and ice on the roof which will leak into the home over time. Also, remember you cannot “layover” asphalt on a wood shingle roof or vice a versa.
Are you going to install drip edge/edge metal when you install my roof?
Can I replace an asphalt shingle roof with a metal roof?
Let's Get Started
Phone: (801) 367-7554
Email: info@ravenroofingandcontracting.com
Hours of Operation
8am-7pm, Monday-Saturday

Look at some of the many areas Raven Roofing provides service to its’ clients.